The
Willard Beach System
Research
Resource
&
Management
Guide
PREPARED
BY:
The
Willard Neighborhood Beach Committee
Theresa
Wiper, Chairperson
Cara
Blazier
Daryl
& Judy Cooper
Steve
Gray
Paula
Harris
Tex
Haeuser
John
Murphy
Brenda
Peluso
Lois
Reckitt
Deb
Sandler
Douglas
Uranek
Executive Summary & Recommendations.........
4
I Introduction
9
II About the
Willard Beach System...
10
A)
Background
B)
Sea Level
Rising
C)
History of
Casco Bay Water Quality
D)
1982 Army
Corps of Engineers Report summary
III
Sewer & Water Lines.
13
A)
Water Lines
- Portland Water District
i)
Locations
B)
Sewer Lines
i)
Location,
sizes, and ages of lines
ii)
Pipe
replacement issues
iii)
Separation
of storm and sewer water (Results 2002)
iv)
Storm drain
runoff - Best Management Practices
v)
Beach water
testing and 2002 summer testing results
IV
Dune Management.....
16
A)
Background
on dune grass
B)
Dune grass
planting
C)
Dune grass
removal
D)
Dune fencing
/ Dune Walkovers
E)
Dune Grass
Die-Out
F)
Coastal
Resource Planner - Dune Vegetation Restoration
G)
Sand Dune
Map (2002) - Maine Geological Survey
V
Hazard Mitigation Plan -
South Portland Waterfront Development
19
VI
Beach
Replenishment/Nourishment
20
A)
Background
Research
B)
Erosion
Discussion
VII
Mooring Information - Portland Harbormaster....
22
VIII
Punts.
23
A)
Storage
locations
B)
Proposed
Punt Rules
C)
South
Portland Parks and Recreation rules regarding punts and beached boats
IX
Animal Information
25
A)
Dog Owner
Rules
B)
Mammal
Strandings
X
Police Department -
Beach Rules.
26
XI
Beach Entrances
27
A)
General
Information and plant maintenance
Attachment - Spring Point Shoreway Improvements Plan (Mitchell &
Associates, Feb. 2000)
XII
Shoreline Regulations -
City of South Portland Code Enforcement
28
XIII
Coastal Sand Dune
regulations -
Maine Dept. of Environmental Protection
29
XIV
South Portland Floodplain
Management Regulations....
30
XV
Fish Shacks
31
XVI
Bath House
32
A)
Maintenance
B)
Lifeguard
Duties
C)
Bathroom
Facilities - Off season availability
D)
Swimming
Float
XVII
Current Beach Maintenance
Practices
34
XVIII
Other Issues & Research
35
A)
Jetty
B)
Beach
cleaner
C)
Seaweed
information and removal issues
D)
Seawall
construction
E)
Coast Guard
numbers (to call when identifying water pollution)
XIX
Who To Call
(Provided by the Friends of Casco Bay)..
37
With regards to the following:
search and rescue, clam flat questions, dredging, coastal clean-up,
education, general questions about the ocean, oil spill emergencies, reporting
sewage from boats, oil recycling information, fisheries, injured birds and
wildlife, marine mammal strandings, red tide hotline, water quality or other
pollution questions, speakers, other Casco Bay groups,
environmentally-friendly landscaping contacts, pump out services
XX
List of Resources
41
XXI
Appendix
1.
Barry
Timson’s 1977 Geological Survey of Willard Beach
2.
South Portland Tax Map of Willard Beach
3.
FIRM - Flood Insurance Rate Map
4.
Willard Beach Resolution dated December 6, 1999
5.
Coastal Beach Resource Planner - Sue Schaller’s
notes on 10/31/02 beach visit
6.
Summer 2002 Beach water testing results
7.
Dune Grass Die Out Information
8.
Dune Vegetation Restoration Efforts (November 14,
2002 e-mail from Sue Schaller)
9.
Willard Beach Sand Dune Map - Maine Geological
Survey
10.
Willard Beach - Storm discussion (May 14, 2002 from
Steve Dickson)
11.
Shoreline Zoning Regulations
12.
Sand Dune Regulations - Current and Proposed
Changes
13.
South Portland Floodplain Management Regulations
14.
List of Pumpout Service for Recreational Boats
(from Friends of Casco Bay)
15.
Willard Beach Sewer and Storm Drain Lay-out Diagram
16.
Mooring Application and Rules
I
Introduction
This Willard
Beach Resource and Maintenance Guide has been created for both city officials
and residents of the neighborhood as well as other concerned citizens.
Recommendations for recreational usability, long-term welfare of the beach and
the surrounding communities are included in this summary.
It is our
intention that this document be consulted as changes/improvements to the area
are planned. This document will
continue to be updated as more information is obtained or beach conditions
change. It is the primary
responsibility of the Willard Neighborhood Beach Committee to insure its
relevance and communicate its intentions.
Distribution List:
§
The
City of South Portland:
§
Town Council Members
§
City Manager - Jeff Jordan
§
Parks and Recreation Department - Dana Anderson
767-7651 and John Switzer 767-7670
§
Public Works Department - Steve Johnson 767-7635
§
Pollution Abatement Department - Pat Cloutier,
David Thomes 767-7678
§
City Engineer - Dave Pineo 767-3383, Craig Worth
767-7645
§
Planning Department - Tex Haeuser 767-7602
§
Waterfront Development Director - Tom Meyers
767-5556
§
Code Enforcement - Pat Doucette 767-7603
§
South Portland Conservation Commission
§
Nonprofit
& Community Organizations
§
Willard Neighborhood Association - President
§
Willard Neighborhood Beach Committee - Chairperson
§
Friends of Casco Bay
§
South Portland Dog Owners Group
§
South Portland Land Trust
§
South Portland Public Library
§
The
State of Maine
§
State Planning Office - Maine Floodplain Management
Program
§
State Planning Office - Maine Coastal Program
§
Southern Maine Regional Planning
§
Maine Geological Survey
§
Maine Department of Environmental Protection
II
About the Willard Beach
System
Willard
Beach is an important recreational resource and open space for the city of
South Portland that is used daily by many people.
We are fortunate to have such a public treasure, as there are only 70
miles of sandy beach in 4,500 miles of Maine coastline.
Willard Beach is one of a few free public beaches south of the city of
Portland.
Sea
Level Rise: In the
October, 1999 beach walk meeting, Joe Kelley (Geologist, USM) stated,
“The biggest problem this beach and other beaches
face is the rising of the ocean. The
ocean has risen almost a foot in the tide gauge in Portland since 1912.
And if you look at the slope of the beach here, it is gentle.
A one foot vertical rise in the water means the shoreline moved a
considerable distance landward.” (See Appendix 1)
Pollution:
In the 1980's, Casco Bay was considered one of the top ten most polluted bays
in this country. Copies of the
report, The Dirty History of Portland Harbor, are filed at the South
Portland Library and may be obtained from the Friends of Casco Bay.
Since then,
cities and citizens have worked to clean up Casco Bay and the ongoing
activities of today (See Section III) will have a positive and long lasting
effect on the Bay and on Willard Beach. It
is important to consider “that every watershed eventually empties into the
ocean, and each of us lives in a watershed.
Each drop of rain that lands on each lawn is an empty vessel, ready to
carry contaminants down through the watershed. Cleaner watersheds will
continue to lead to a cleaner bay. The
phone number for the Casco Bay Estuary Project is listed in Section XVI of
this report.
Erosion: In
1982, The Army Corps of Engineers investigated beach erosion control needs for
Willard Beach. The Corps
recommended the rebuilding of the crib wharf jetty and the construction of two
groins at the bathhouse and at the north end of the beach. It also recommended beach nourishment in the front beach area
and called for back beach area dune restoration to be accomplished by dune
fencing and dune grass plantings. The
high cost and the uncertainty of the success of implementing all but the last
recommendation (dunegrass planting) proved prohibitive.
At this time, the science does not support their future implementation.
Recommendations
III
Sewer & Water Lines
1)
Water Quality Alerts (Parks & Rec.):
a)
Post Signs at each beach entrance with the
following information:
i.
General post-rain event advisory
ii.
Look for flags (yellow and red) above beach house for beach swimming
advisories & closures
iii.
Watch for submerged hazards in swimming area
b)
Establish Flag system at the beach house
2)
Pollution Abatement
a)
Research the feasibility of capturing the
"first flush" to improve overall water quality after rains.
b)
Research feasibility, and if appropriate, develop a
long-term plan to remove sewer pipes from under the beach.
c)
Beach committee volunteer will help to coordinate
volunteer education efforts with appropriate municipal/state and private
organizations.
d)
Recruit volunteers with in the community to assist
the city with NPDES Phase II Education (Note:
c&d could be put together into one recommendation and specifically name
the school board and other organizations to assist city)
IV Dune
Management
1)
Beach
committee will draw up plans for the placement of dune fencing, walkovers (if
appropriate) and plantings and seek city approval of plans.
2)
Beach
committee will provide volunteers who will continue to work with the city to
obtain approval, needed material, funding and support to do the following:
a)
Continue to plant dune grass and put up dune
fencing where appropriate - It is specifically recommended to fence in a
portion of the dune between Myrtle Avenue and Beach Street entrance and plant
some dune grass. Also it is
recommended to put in wood posts along either side of the recreational area by
the bathhouse to delineate dune and recreational area.
b)
It is recommended to plant a greater variety of
plants in the dunes for genetic diversity
c)
Review the possible use of dune walkovers where
appropriate.
V
Hazard Mitigation Plan - South Portland Waterfront Development
1)
Beach
committee will continue to provide Tom Meyers, Director of Waterfront
Development for the City of South Portland, with information necessary to
complete the Hazard Mitigation Plan.
2)
It is
recommended that the Hazard Mitigation Plan include provisions for the
rebuilding of the dunes after a natural disaster or flood.
Include in these provisions would be criteria for dune replenishment,
timing and sand and plant sources for dune restoration.
VI Beach
Replenishment/Nourishment
Beach
committee will continue to research replenishment in the back beach area (dune
area). There is no recommendation
for sand replenishment on the beach face at this time.
VII
Mooring Information -
Portland Harbormaster
Please
consult section VII of this guide for current regulations and contact
information.
VIII
Punts
1)
South Portland Parks & Recreation Department
and the Willard Beach Committee shall establish punt storage areas (on or off
the beach) clearly defined by signs. It
is recommended that two signs connected with Coast Guard chain for punt
attachment border each area. City
or volunteers shall install signs and chains.
2)
The Willard Beach Committee will write a proposal
to the Harbor Master to create and enforce a new regulation requiring the
mooring number be placed on all punts stored at Willard Beach.
3)
The Beach Committee and the City of South Portland
Parks & Recreation Department will help alert the Harbor Master of Punts
left in storage areas after November 1st or before April 1st.
IX Animal
Information
Please
consult section IX of this guide for current regulations and contact
information.
X
Police & Fire Department - Beach Rules
Please
consult section X of this guide for current regulations and contact
information.
XI Beach
Entrances
1)
Beach committee will draw up plans for the
reconfiguration of the beach entrances in order to retain sand, build dune and
prevent storm surge from entering roadways.
These plans would be reviewed and approved by the Parks and Recreation
Department before implementation.
2)
Beach committee will provide volunteers who will
continue to work with the city to obtain needed material, funding and support
to accomplish this reconfiguration.
3)
The Beach Committee and the City of South Portland
Parks & Recreation Department will work together to remove existing
invasive plants and fill in with native vegetation where needed.
4)
Two blocks of granite should be placed at the
bottom of the Deake Street Entrances. One
at the bottom of the ramp and the other at the bottom of the stairs.
Alternatively, explore the option of removing concrete ramp.
XII
Shoreline Regulations -
City of South Portland Code Enforcement
Please
consult section XII of this guide for current regulations and contact
information.
XIII
Coastal Sand Dune
regulations - Maine Department of Environmental Protection
Please
consult section XIII of this guide for current regulations and contact
information.
XIV
South Portland Floodplain
Management Regulations
Please
consult section XIV of this guide for current regulations and contact
information.
XV
Fish Shacks
1)
It is recommended that the City of South Portland
Parks & Recreation Department will provide a mason and materials to fix
the chimney on the biggest shack.
2)
The Willard Neighborhood Association and the Beach
Committee will continue to recruit volunteers to maintain and repair the
shacks. Materials will continued
to be provided by the City or donated.
XVI
Bath House
1)
The Willard Neighborhood Association and the Beach
Committee will continue to recruit volunteers to maintain the paint &
stain on the BathHouse. Materials
will continued to be provided by the City or donated.
2)
For lifeguard assignment recommendations, see
Section 17.
3)
It is recommended that a Portable Toilet be placed
at the BathHouse during the months of May and September. This toilet could be attached in a way to prevent tipping.
XVII
Current Beach Maintenance Practices
1)
$City to create budget line item to fund contract
labor for the following beach maintenance items:
a)
Remove large and/or hazardous debris from Willard
Beach after large storms. Currently,
Steve Gray, a beach committee member, removes the heavier debris at the beach
and puts it in piles for Public Works to pick up.
This is recommended in anticipation of the future absence of Steve’s
volunteer services.
b)
Rake seaweed:
i.
At the
beginning of the month (June, July, and August) and in coordination with a
full or new moon (see Section 18c for timing) and rake the seaweed into the
water in the main bathing areas of the beach (from Beach Street to Willard
Street). It is anticipated to
recruit volunteers to rake any seaweed
in July and August. It is
recommended that the city contract labor to rake in early June.
No raking will be required if there is no significant seaweed on the
beach at any of these times.
ii.
In the fall,
after the first significant October Storm, the beach committee will recruit
volunteers to place seaweed and seed in the dune. This will provide much need nutrients in the dunes.
Invasive plants in the dunes will be removed at this time.
2)
Assign regular beach cleaning duties to lifeguards.
These should include raking around the beach house and major recreation
areas as well as picking up trash along the length of the beach.
At the beginning of the day, one lifeguard will go down the beach to
pick up trash, and one lifeguard will rake the recreational area by the
bathhouse and pick up debris.
3)
Include the daily cleaning of the concession area
as a stipulation of the contract for the snack bar.